Decks & Pergolas · Ontario Building Code
Deck permit drawings — detailed and ready to submit.
Licensed P.Eng. · BCIN #511123. Permit-ready drawings in 1–2 weeks, from $1,000. Footings, framing, guards and stairs detailed so your file is complete when it goes in.
- Footings, beams and joist spans sized to OBC Part 9 tables.
- Guards, stairs and ledger attachment detailed to code.
- Zoning & setback check before we draw — so you don't discover a variance late.
- Pergolas and covers included — snow load and beam coordination handled.
Get a fixed quote
From $1,000. Tell us the municipality and your timeline — same-day reply on weekdays.
How It Works
From first call to approved permit.
Recent Deck Permits
Real permit sets, approved.
Fee Ranges
What a deck permit costs.
Fixed fees, quoted up front. The scope decides the price, not your budget.
Site measurement and as-built drawings are part of every project. If the design needs setback relief, the minor variance / Committee of Adjustment package is $1,000 (excludes the municipal application fee).
Fees exclude HST, municipal permit and application fees, land survey, and conservation authority (TRCA) fees.
What clients say
Rated 5.0 on Google.
“Mateo has been very reliable and easy to work with for an exterior stair project I did. He turned over my permit drawings in a couple of days and made revisions very quickly.”
“He prepared all the drawings for my deck and helped me through the permit process until everything was approved. … I would definitely recommend Mateo to anyone who needs engineering drawings or help getting a building/deck permit.”
“Great experience! Very excellent work and communication to get the job done. Helped me a lot with the permit processes.”
FAQ
Deck permit questions, answered.
How much do deck permit drawings cost?
From $1,000 for a simple attached deck, $1,100 for an elevated deck with guards and stairs, and $1,600 for multi-level or ravine/TRCA jobs. A deck with a pergola starts at $1,400. Fees exclude HST, municipal permit fees and survey. Where structural engineering is needed, our in-house P.Eng. does it and it is quoted up front with your project. See the full fee ranges.
Do I need a permit for my deck in Ontario?
Generally yes once the deck is raised above a certain height above grade, attached to the house, or over a set area — and the exact trigger varies by municipality. Send us the size and height and we'll tell you whether you need one before you pay for anything.
How long does it take?
1–2 weeks for a permit-ready set. Municipal review time is on top and varies by city. We answer every review comment on the original scope at no extra cost.
What if my deck doesn't meet the setbacks?
We check zoning — setbacks, lot coverage and height — before drawing, so you find out early. If you need relief, we prepare the minor variance / Committee of Adjustment package for $1,000, excluding the municipal application fee.
Which cities do you serve?
We work across Ontario, with most projects in Toronto and the GTA. Site measurement and as-built drawings are part of every project.