Skip to the quote form
Structural engineering 01 Projects 02 Services 03 How it works 04 Pricing 05 Reviews 06 Get a fixed quote 07

Toronto & the GTA · serving all of Ontario

(905) 301-4032
info@mspermits.com

Structural Engineering · Licensed P.Eng.

Structural drawings & reports — by a licensed P.Eng.

Licensed P.Eng. · BCIN #511123. Beams, footings, wall removals, walkouts, underpinning and outdoor structures — engineered in-house and coordinated with your permit drawings.

  • Engineered in-house — no hand-off between a designer and an outside engineer.
  • Coordinated with the permit set — structural notes and details match the drawings the city reviews.
  • Letters and reports written by the engineer who reviewed the work.
  • We file the application with your municipality for you.
Licensed P.Eng. BCIN #511123 5.0 ★ on Google · 14 reviews We submit your application

Get a fixed quote

Tell us what's changing and where — same-day reply on weekdays.

We measure the site as part of every project.
PDF, images or CAD files. You can select more than one.
Same-day reply on weekdays

What We Engineer

Structural design for houses and small buildings.

We design the parts of a building that carry load, and draw them so the permit reviewer, the contractor and the inspector all read the same thing. Structural design is done by our licensed Professional Engineer and coordinated with the rest of your permit drawings.

Reports & Letters

Engineering letters and reports.

Not every job needs new drawings. Sometimes the municipality, a buyer or you need an engineer to look at what's there and put it in writing.

  • Structural site reviews — cracked foundations, sagging floors, bouncy decks, leaning retaining walls.
  • Condition assessments of an existing structure before you renovate or buy.
  • Engineering letters requested by the municipality during permit review.
  • Responses to structural review comments on drawings already submitted.
  • Existing-structure reviews for legalizing work — basements, decks and additions built without a permit.
  • Site reviews during construction where the permit or the design calls for an engineer's review.

Fixed fees, quoted up front. Tell us what you need and we'll come back with the scope and a fixed fee — same-day reply on weekdays.

Code & By-Laws

When does a project need an engineer?

Most houses are designed under Part 9 of the Ontario Building Code, which uses prescriptive tables for spans, footings and framing. Engineering is typically needed when a project steps outside those tables. Common triggers:

This is a general guide, not a code review. What applies depends on the scope, the municipality and the building. Tell us what you're planning and we'll confirm whether it needs engineering before you commit to anything.

Get a fixed quote

Recent Structural Scope

Permit sets with structural work.

What clients say

Rated 5.0 on Google.

5.0 14 reviews on Google Read our Google reviews →
“I've been working with Mateo for the engineering drawings and permit process for our awnings and patio covers projects, and I couldn't be happier with his work. He is knowledgeable, professional, and genuinely cares about getting things done right and on time. … As a business owner, finding someone reliable who understands both the technical side and the permit process makes a huge difference.”
Karan Jawandha Engineering drawings · awnings & patio covers Google review
“I had a great experience working with Mateo on my deck permit. He is very professional, knowledgeable, and easy to work with. He prepared all the drawings for my deck and helped me through the permit process until everything was approved. … I would definitely recommend Mateo to anyone who needs engineering drawings or help getting a building/deck permit.”
N. H. Deck permit · Local Guide Google review
“Mateo has been very reliable and easy to work with for an exterior stair project I did. He turned over my permit drawings in a couple days and made revisions very quickly. I'm very happy with his service and will use again in the future.”
Brandon Pettit Exterior stair permit Google review

FAQ

Structural engineering — answered.

Can you engineer drawings someone else prepared?

Often, yes. If your permit drawings came from another designer, we can review the structural scope, design the elements that need engineering, and issue structural drawings or a letter to go with the set. We'll tell you up front what we need to see.

Will I still need a separate engineer?

Not for the structural design we cover — that's done in-house by our P.Eng. Some items are always designed by the manufacturer, such as roof trusses and some engineered floor systems, and a few projects need other specialists, for example a geotechnical report on difficult soil. We'll tell you at the quote stage if yours does.

When does a building permit need a structural engineer?

Most houses are designed under Part 9 of the Ontario Building Code using its prescriptive tables. An engineer is typically needed when a beam or span falls outside those tables, a load-bearing wall is removed, a foundation is underpinned or opened for a walkout, a retaining wall is tall enough to need design, or the building is outside the scope of Part 9. Some municipalities also ask for an engineer's letter on specific items.

Get a fixed quote

Call now